Our project cargo portfolio continues to grow as the Logistics Plus Project Cargo Team is keeping busy all around the world. Here are some recent cargo projects handled by our global team of logistics professionals:
- Load a dismantled ship unloader from a barge in Taicang, China for transport to Grain Terminal in Haifa, Israel (normally only grain can be loaded/unloaded here, but we acquired permission under special permit from Port of Haifa).
- Pick up 84.5 metric ton heavy gas turbine from storage area in Antwerp, Belgium; load to barge, shift to outgoing terminal, and load on container vessel for breakbulk shipment by floating crane; final delivery to China.
- Pick up 94 metric ton heavy gas turbine from storage area in Antwerp, Belgium; shift to Rotterdam and load on container vessel for breakbulk shipment to Shanghai, China.
- Pick up two (2) oversized skids in Zaventem, Belgium and truck them all the way to Skogn, Norway.
- Receive damaged FGSS (fuel gas supply system) skid from Shanghai, China, and truck to Jiaxing factory for repairs. Upon completion of repairs, pick up at factory and truck back to Shanghai; ship to Imabari, Japan shipyard.
- Collect various components for re-liquefaction system from various suppliers; export to Shanghai; re-import and deliver to Hudong, China shipyard.
- Ship two moonpool hatches and components from Rotterdam, Netherlands to Suape, Brazil.
- Pick up three (3) windmill blades each 67 meters in length in Jiangyin, China; bring them to port and ship to Eemshaven, Netherlands.
- Pick up six (6) windmill blades each 50 meters in length in Tianjin, China; bring them to port and ship to Eemshaven, Netherlands.
- Ship 32 brewery system tanks and supporting legs from Antwerp, Belgium to Namibe, Angola.
The animated image below contains photographs from the projects described above.
Need help with your big, bad or ugly project cargo? Let us know!