Crypto Mission Critical

Enhance your crypto mining capabilities with LP Cryto Mission Critical Soluitons. We offer a comprehensive range of solutions tailored for the cryptocurrency industry worldwide.

Enhance Your Crypto Mining capabilities with LP Crypto Mission Critical

LP Crypto Mission Critical offers a comprehensive range of solutions tailored for the cryptocurrency industry worldwide. Enjoy simpler and faster operations, turn-key supply chains, unlimited scalability and unmatched adaptability to changing market demands. With our global network spanning over 50 countries, our dedicated Crypto Mission Critical team ensures reliable and cost-effective solutions, making us the trusted partner for the most sensitive, time critical and complex needs.

OUR SERVICES

  • Global trade advisory / procurement optimization / incoterm negotiation, market cost analysis, etc.
  • Freight forwarding / logistics services (transport sequence optimization, mode selection, ocean / air / truckload / LTL / parcel / rail)
  • EOR / IOR services, in-house customs brokerage and compliance services
  • Warehousing, storage & inventory management – national, regional & local / job site buffer stock sites; FTZ and bonded warehousing
  • Product configuration – offsite and onsite materials management, product assembly, integration, setup, etc.
  • Materials sourcing – transformers, generators, chillers, louvers, PDUs, cable, miners, etc.
  • Supply chain visibility / control tower solutions
  • Data center commissioning, decommissioning & reconfiguration staffing solutions
UPDATED Crypto Flyer 2025 thumbnail

View Or Download Our Solutions Overview PDF.

Case Study 1: Full-Scale Commissioning of a New Data Center in TX, USA

Context:

  • The client is a medium-sized miner expanding their data center footprint
  • New set up of a 10MW BTC facility in TX
  • Over 2500 S21 miners procured from the manufacturer
  • Tight project deadlines to go live and maximize ROI

 

Key Challenges:

  • Lack of talent pool / skilled labor near the site
  • Potential risks/bottlenecks (US Customs, site operations, material flows)
  • Lack of coordination between distributed parties involved in the supply chain

Solution:

LP Crypto Mission Critical provided end-to-end supply chain solutions for the client, including:

  • Advised procurement team to use EXW INCOTERMS, negotiate product cost down, and control the inbound logistics
  • Monitored manufacturing progress and coordinated mining unit pickup from the factory
  • Provided door-to-door freight forwarding services (split the PO across multiple air charters, cleared US Customs, paid duties, delivered last-mile to site)
  • Provided onsite staffing (15+ people) to support the workload surge:
    • Shipment unload, receive, unbox, inspect, asset tag application
    • Rack units, connect power and network cables
    • Power on machines, configure, upgrade firmware, diagnose error logs,
    • document serial number, map site, troubleshoot DOA units
    • Clean & refurbish mining units, hot swap / replace with parts on-site
    • Remove & install air filters as needed
    • Remove / clear / recycle all trash and corrugate (retaining 2% corrugate in
    • stock for DOA returns)

Results:

  • Mining operations online at 100% expected operational hashrate
  • Installation/commissioning condensed to 8 days using LP’s extended workforce
  • Minimized downtime and reduced total deployment cost through proactive contingency planning; ROI achieved in the shortest time possible
  • DOA miners addressed onsite to mitigate lost hashrate
  • Visibility of all inventory maintained throughout the product lifecycle
case study 1 crypto image

Case Study 2: Decommissioning & Reconfiguration of an Aging Data Center in OH, USA

Context:

  • The client is a large miner with a distributed network of data centers of varying ages
  • Upgrading of a 25 MW BTC facility in OH
  • Decommissioning & asset recovery of over 8000 S19 generation miners and commissioning of over 6500 S21 Pro miners at the site

 

Key Challenges:

  • Electrical upgrades required (and rolled out in 2 phases)
  • Site infrastructure upgrades necessary to accommodate S21 generation miners
  • Need to minimize mining downtime during site upgrade
  • Lack of talent pool / skilled labor near the site
  • Potential risks/bottlenecks (US Customs, site operations, material flows)

Solution:

LP Crypto Mission Critical provided end-to-end supply chain solution for the client, including:

  • Staged logistics routing in phases to match electrical upgrades and balance site workload (split PO across multiple air shipments for phase 1 deliveries and ocean shipments for phase 2 deliveries)
  • Provided all inbound and outbound transportation of all mining units, enabling equipment and consumables
  • Removed & stored decommissioned S19 units at our offsite regional warehouse
  • Provided onsite staffing (15+ people) to support workload surges across both phases:
    • De-rack S19 units, capture serial numbers/inventory in WMS
    • Remodel existing racking and hot isle isolation measures to accommodate larger form factor S21 generation miners
    • Manage logistics for PDUs, power cables, consumables, and disposal of e-waste
    • Modify power distribution systems to accommodate larger power draw units and enable 3-phase 380V units (including power cabling and ethernet)
    • Unload, receive, unbox, inspect, asset tag application on new S21 units
    • Rack units, connect power and network cables
    • Power on machines, configure, upgrade firmware, diagnose error logs, document serial number, map site, troubleshoot DOA units
    • Clean & refurbish mining units, hot swap / replace with parts on-site
    • Remove & install air filters as needed
    • Remove / clear / recycle all trash and corrugate (retaining 2% corrugate in stock for DOA returns)

Results:

  • Installation / commissioning activities condensed using LP’s extended workforce
  • Total cost impact reduced through proactive logistics sequencing and workload balancing
  • ROI achieved in shortest time possible
  • Visibility of all inventory (S19 and S21) maintained throughout product lifecycle
case study 2 crypto image

Contact Us

Name(Required)
Area of Interest (Select multiple if needed)(Required)

This field is for validation purposes and should be left unchanged.