The Logistics Plus Project Cargo team recently transported steel structures for a worldwide leading steel manufacturer. This manufacturer completes projects for thermal power plants, hydroelectric power plants, industrial plants, refineries, chemical plants, bridges, and more. The shipment Logistics Plus handled was from the client’s factory to Aliağa port in Turkey.
Logistics Plus Global Projects Director Bahadir Erdil commented on the success of this project. “I’m happy we (Logistics Plus) were chosen to help with this project. Our global projects team has a lot of experience in the steel industry, and it showed. We completed this project timely and to our client’s exact specifications.”
The size of the two largest structures are listed below. In total, Logistics Plus transported 35 items weighing 1,000 tons.
Length: 35 meters / Width: 4.4 meters / Tonnage: 87 tons
Length: 13.5 meters / Width: 7.9 meters / Tonnage: 38 tons
You can watch the highlights from this project in the video below or on the Logistics Plus YouTube Channel.