Happy Holidays and Happy New Year from the Logistics Plus global project cargo team! Here is a short video of a cool year-end “600 MW Electric Converter Station System Project” that was coordinated with Hareket. The project involved the safe movement of 5 transformers, each 219 metric tons; and 3 reactors, each 65 metric tons. 18 axle hydraulic lowbeds were used and the total route was 1121 kilometers. The rigging and assembly operation was executed with a crew of 24 and a 600 metric ton gantry system. #PassionForExcellence